Company Party — Saaremaa
Company party production on Saaremaa: crew logistics, load-in on rural sites, and what the ferry crossing means for the schedule.
A company party on Saaremaa means the crew leaves Tallinn before sunrise. The ferry crossing is fixed; the van is packed the night before. Most venues are twenty minutes down a dirt track from the nearest town, and the things that break — a blown fuse, a missing adapter, a door two centimetres narrower than the case — cannot be fixed with a phone call.
Load-in starts the moment the keys arrive, usually mid-morning. Power is tested first, then rigged. By the time the first guest boards the afternoon ferry, the room is lit and the bar is stocked. The last case goes back on the van after midnight, and the crew makes the last sailing or sleeps in the vehicle.
Every production is built from the same toolkit — take one part of it or the whole evening.
- Full Wedding Production
- Sound & Light Setup
- Technical Production
- Event Staffing
- Event Coordination
- Video & LED
- Staging & Decor
- Artist Booking
Describe it in a few sentences — we reply within one business day.
Get in touch
After 5 Events